Get complete information related to latest Furnace Coil Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Furnace Coil Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Furnace Coil Tenders.
Tender For supply of furnace for burn out programmable , crown and bridge calipers spring for wax, iwanson pattern , grinder high speed for ally , induction casting machine , lab instrument set of six for crown and bridge wax up , lab instrument set of six for porcelain buildup , micro motor brushless heavy duty for lab , model trimmer with double disc , mold for investment ring former, sprue base, ss for investment in 04 sizes , pressable ceramic system , sandblaster with pencil nozzle and 50 and 250 micron sand blasting material , steam cleaner dental lab for metal work , vacuum mixer , crown and bridge calipers spring for metal, iwanson , crown and bridge holding pliers
Tender For bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : supply of vacuum induction melting furnace c c - pulse xmer assy for inv scr 3khz and above part no - fmod005864 , inducto high performa scr 147-9116-4 part no - fimp005030 , inducto high performa diode 147-9110-7 part no - fimp000001 , inducto high performa scr 147-9109- pe part no - fimp005186 , new gld module assy rev point 2 ip 819684rev2 w inrlk relay part no - fmod006347 , new gld optobridge module ip 819239rev1 part no - fmod006632 , choke 100 ma 12 henry d point c point part no - ftra001000 , pressure switch mg h07 ca 00 part no - fmet001067 , pressure switch - 0 point 2 to 7 point 5 bar model no kp-35 make-danfoss part no - fmet001174 , fast acting fuse 800a 690v part no - ffus001032 , lockable cam switch 4ploe 2way with off part no - fswr001020 , converter snubber assy equi fimp0265 part no - fsaa001021 , inverter snubeer assy l h s part no - fsaa001031 , invertor snubber assy r h s part no - fsaa001032 , relay 24v ac dc i p 2-no nc o p part no - fswr000128 , w point c point lead 16 no 10 ft long part no - ffas009001 , aux contact module la 1kn22 point telemecanique part no - fccb001047 , potentiometer 146- 0501-8 part no - fimp000009 , power control knob part no - fenh000014 , charge rasin for deionizer-mb-12 1ltr pk part no - fcom000061 , temp sensor of 145f 149-07441 with pcb manual reset part no - fimp000699 , temp sensor of 175f 149-0743l with pcb manual reset part no - fimp000700 , 40kg vim power port and feedthru for dmrl for gca make fce part no - vfaa008294
Tender For tender for supply of coal lab equipment spares -muffel furnace ssr 40 amps dc to ac , hot air oven 1/35 hp motor with ss blade , muffel furnacecoil with muffl 5x5x10 , muffel furnacecoil refra chmbr 4x4 x9 , hot air oven digital controller , muffel furnacecoil with ref chamber
Tender For corrigendum : supply of bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ]
Tender For bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ]